Current Business Opportunities

EAST SIDE ROADWAY AND UTILITY EXPANSION WITH CLEARING AND GRUBBING ALTERNATE - IFB #15-2217
The project scope shall consist of Base Bid and Alternate:
Base Bid:  The base bid encompasses the construction of a private four-lane divided roadway on the eastern portion of the Airport property, as well as a sanitary sewer force main relocation and new water main construction, per state and locality requirements.  The scope also includes pavement removal and the limited demolition and abandonment of existing utilities and buildings as needed to install these measures.
Alternate:  The alternate scope of work consists of the clearing and grubbing of an area larger than the proposed road corridor, and the installation of the perimeter erosion control measures required for such work.


For business opportunities with the Commission, contact us.