Search flight

Arrivals

Airline Flight # Gate Arriving From Time Status
AirTran 205 B13 Atlanta 10:49 PM On Time
American 2822 A1 Chicago-O'Hare 7:05 PM Arrived
American 1276 A3 Dallas Ft. Worth 10:50 PM On Time
American 3504 A1 Miami 9:00 PM 8:55 PM
American 3011 A1 New York-LGA 9:30 PM On Time
Delta 1198 B15 Atlanta 6:56 PM Arrived
Delta 1124 B15 Atlanta 9:00 PM 8:49 PM
Delta 5407 B10 Boston 8:27 PM 8:21 PM
Delta 5451 B14 Cincinnati 9:19 PM 9:14 PM
Delta 5287 B12 Minn/St. Paul 10:51 PM On Time
Delta 2909 B12 New York-JFK 9:21 PM On Time
Delta 5021 B14 New York-LGA 8:12 PM 8:03 PM
JetBlue 1146 B9 Ft. Lauderdale 9:40 PM 9:34 PM
United 5669 B2 Chicago-O'Hare 8:00 PM 7:54 PM
United 774 B3 Chicago-O'Hare 9:32 PM On Time
United 4330 B2 Houston 10:52 PM 10:49 PM
United 4131 B2 Newark 8:40 PM 8:44 PM
United 4119 B2 Newark 10:27 PM On Time
United 6027 B2 Washington-IAD 10:35 PM On Time
US Airways 3905 A8 Boston 9:17 PM On Time
US Airways 2798 A6 Charlotte 6:55 PM 6:46 PM
US Airways 2080 A6 Charlotte 9:16 PM On Time
US Airways 4652 A7 Philadelphia 6:42 PM 8:02 PM
US Airways 3901 A7 Philadelphia 10:46 PM On Time

Departures

Airline Flight # Gate Departing To Time Status
American 2984 A1 Chicago-O'Hare 7:35 PM On Time
American 2992 A1 New York-LGA 6:50 PM Departed
Delta 1198 B15 Atlanta 7:31 PM On Time
JetBlue 1282 B9 Boston 6:50 PM On Time
US Airways 2699 A6 Charlotte 7:31 PM Boarding
US Airways 4605 A7 Philadelphia 7:08 PM 8:18 PM

Screening Checkpoint Hours – 4:30 am to 8:30 pm

Travel Advisory UPDATE - Repair Work Completed. RIC's Upper-Level Roadway Reopened

November 19, 2012

RICHMOND, Virginia (November 28, 2012) –Richmond International Airport’s (RIC) upper-level (Departures) roadway will be closed to all vehicle traffic from 7:00 am – 4:00 pm for three days, Tuesday, November 27th, through Thursday, November 29th, due to necessary maintenance on the terminal building exterior.

UPDATE: Terminal building repair work at RIC has been completed and the upper-level roadway has reopened to vehicle traffic.  

During the daily closure periods, all vehicles will be directed to the lower-level (Arrivals) roadway for both arrivals and departures. Electronic signs will be in place on Airport Drive to alert motorists of the temporary traffic change and officers with the airport’s police department (RICPD) will be on hand to assist.   

Customers are advised to follow posted speed limits and anticipate temporary traffic pattern changes during the maintenance closures of the upper-level roadway. Additionally, the height clearance for the lower level roadway is 12’ 2” (twelve feet, two inches). Customer and commercial vehicles exceeding the height limit should avoid approaching the terminal building while the upper level roadway is closed.

Throughout the maintenance period, pedestrian traffic will continue to have access to the upper level walkways between the terminal and the North and South parking garages. 

 

CONTACT:

Troy M. Bell, C.M.
Director – Marketing & Air Service Development/PIO
804-226-3022
tbell@flyrichmond.com
 


Back