Search flight

Arrivals

Airline Flight # Gate Arriving From Time Status
American 2255 A3 Dallas Ft. Worth 11:35 AM Arrived
Delta 2399 B15 Atlanta 1:42 PM 1:31 PM
Delta 1178 B15 Atlanta 3:51 PM On Time
Delta 5207 B12 Detroit 2:15 PM 2:09 PM
Delta 6183 B14 New York-LGA 12:12 PM Arrived
Delta 6295 B12 New York-LGA 3:21 PM On Time
JetBlue 1170 A4 Orlando 3:24 PM On Time
Southwest 194 B11 Atlanta 12:10 PM 1:20 PM
United 3422 B4 Chicago-O'Hare 2:04 PM 1:57 PM
United 1341 B2 Newark 1:36 PM On Time
United 4822 B2 Newark 1:56 PM Cancelled
United 3929 B4 Washington-IAD 1:23 PM 1:29 PM
US Airways 4010 A7 Charlotte 12:20 PM 12:05 PM
US Airways 2078 A6 Charlotte 1:46 PM On Time
US Airways 5082 A6 Charlotte 3:35 PM On Time
US Airways 3900 A7 New York-LGA 2:50 PM On Time
US Airways 3817 A8 Philadelphia 2:38 PM On Time

Departures

Airline Flight # Gate Departing To Time Status
American 2255 A3 Dallas Ft. Worth 12:15 PM On Time
Delta 2452 B15 Atlanta 12:18 PM On Time
Delta 2399 B15 Atlanta 2:22 PM On Time
Delta 5119 B10 Boston 12:15 PM On Time
Delta 4881 B12 Detroit 12:55 PM On Time
Delta 6222 B14 New York-LGA 12:47 PM On Time
Southwest 524 B11 Atlanta 12:50 PM 1:55 PM
United 4462 B4 Chicago-O'Hare 1:53 PM On Time
United 4822 B2 Newark 2:21 PM Cancelled
United 1341 B2 Newark 2:21 PM On Time
United 3394 B4 Washington-IAD 2:35 PM On Time
US Airways 1898 A6 Charlotte 2:25 PM On Time
US Airways 3900 A7 New York-LGA 3:15 PM On Time
US Airways 3848 A7 Philadelphia 12:47 PM On Time
US Airways 3817 A8 Philadelphia 3:20 PM On Time

Screening Checkpoint Hours – 4:30 am to 8:30 pm

Travel Advisory UPDATE - Repair Work Completed. RIC's Upper-Level Roadway Reopened

November 19, 2012

RICHMOND, Virginia (November 28, 2012) –Richmond International Airport’s (RIC) upper-level (Departures) roadway will be closed to all vehicle traffic from 7:00 am – 4:00 pm for three days, Tuesday, November 27th, through Thursday, November 29th, due to necessary maintenance on the terminal building exterior.

UPDATE: Terminal building repair work at RIC has been completed and the upper-level roadway has reopened to vehicle traffic.  

During the daily closure periods, all vehicles will be directed to the lower-level (Arrivals) roadway for both arrivals and departures. Electronic signs will be in place on Airport Drive to alert motorists of the temporary traffic change and officers with the airport’s police department (RICPD) will be on hand to assist.   

Customers are advised to follow posted speed limits and anticipate temporary traffic pattern changes during the maintenance closures of the upper-level roadway. Additionally, the height clearance for the lower level roadway is 12’ 2” (twelve feet, two inches). Customer and commercial vehicles exceeding the height limit should avoid approaching the terminal building while the upper level roadway is closed.

Throughout the maintenance period, pedestrian traffic will continue to have access to the upper level walkways between the terminal and the North and South parking garages. 

 

CONTACT:

Troy M. Bell, C.M.
Director – Marketing & Air Service Development/PIO
804-226-3022
tbell@flyrichmond.com
 


Back